Taxiway A Intersections at Phoenix Goodyear Airport 

Project Owner: City of Phoenix
Project Type: Design-Build
Construction Dates: Phase 1: 09/10 to 11/10, Phase 2: 01/12 to 04/12, Phase 3: 10/11 to 01/12

This Phoenix Goodyear Airport Design-Build project includes the replacement, widening, and realignment of existing Taxiways A4, A5 & A6, and A7 to meet Group IV category aircraft operations per the Goodyear Airport Master Plan and FAA Circular 150-5300-13 Airport Design Guidelines. The project will be completed in three phases and work will be done in accordance with airport security and safety. Construction scope includes excavation, grading, soil stabilization, and new pavement with asphalt and cement-treated base. Also, new centerline lighting will be installed as well as the removal and replacement of electrical ductbank and handholes, edge lighting, signs, striping, storm drain pipe and catch basins.

PHASE 3 PHOTOS

3054-GYR-Taxiway-605px-17 

3054-GYR-Taxiway-290px-182px-14

3054-GYR-Taxiway-290px-182px-16

3054-GYR-Taxiway-290px-182px-15

3054-GYR-Taxiway-290px-182px-12


3054-GYR-Taxiway-290px-182px-13

 

PHASE 1 PHOTOS

3054-GYR-Taxiway-605px-6 

3054-GYR-Taxiway-290px-182px-7

3054-GYR-Taxiway-290px-182px-8

3054-GYR-Taxiway-290px-182px-10

3054-GYR-Taxiway-290px-182px-9


3054-GYR-Taxiway-290px-182px-11