Williams Field Road Improvements

Project Owner: Maricopa County Department of Transportation
Project Type: Design-Bid-Build
Construction Dates: 11/11 to 07/12

This project involves widening and drainage improvements to Williams Field Road, from Gilbert Road to Eastern Canal (approximately two miles). Work includes installing a new storm drain system, relocating waterline and hydrants with the demolition and reconstruction of an existing bridge over the Eastern Canal.



3113100-Williams-Field-Road-650px-1 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona 

3113100-Williams-Field-Road-290px-2 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona

3113100-Williams-Field-Road-290px-3 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona




3113100-Williams-Field-Road-650px-4 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona 

3113100-Williams-Field-Road-290px-5 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona

3113100-Williams-Field-Road-290px-6 Achen-Gardner Construction Heavy Civil General Contractor Williams Field Road Improvements Gilbert Arizona